Replacement of 2 heat exchangers classified as safe and seismic
Replacement of 2 safety- and seismic-classified super duplex exchangers for the Flamanville EPR.
In 2019 AlliA was awarded the contract by EDF to replace the two EVU exchangers for the Flamanville EPR. AlliA was responsible for the thermo-hydraulic and mechanical sizing, procurement and manufacture, right through to performance testing, of 2 EVU exchangers in stainless steel 1.4404 and super duplex 1.4410.
All these services were carried out in 2 years and 3 months on this fast-track project.
Contract: Nuclear / Reactor building heat removal system
Code: EN 13445
Dimensions: Ø1500 x 8400
Mass: 30 tonnes
Material: Super duplex
Power exchanged: 20 MW
Other achievements
Each project is tailor-made to meet the needs of the installation. Take a look at our AlliA projects and discover how we optimize every project, from design to commissioning.
Need a customized solution?
Are you looking for a reliable partner for your defense projects? Our experts can advise you and design solutions adapted to your technical, normative and operational constraints. Contact us to study your needs, identify the best options and accelerate the success of your program.